Öffentliche Ausschreibungen icc hofmann - Ingenieurbüro für technische Informatik
Am Stockborn 16, 60439 Frankfurt/M, FRG
Tel.: +49 6082-910101 Fax.: +49 6082-910200
E-Mail: info@icc-hofmann.net
Öffentliche Ausschreibungen

(1) Searching for "2023091509023755004" in Archived Documents Library (TED-ADL)


Ausschreibung: Photovoltaische Solarmodule/Solarzellen - DE-Düsseldorf
Photovoltaische Solarmodule/Solarzellen
Dokument Nr...: 553630-2023 (ID: 2023091509023755004)
Veröffentlicht: 15.09.2023
*
  DE-Düsseldorf: Photovoltaische Solarmodule/Solarzellen
   2023/S 178/2023 553630
   Auftragsbekanntmachung  Sektoren
   Lieferauftrag
   Rechtsgrundlage:
   Richtlinie 2014/25/EU
   Abschnitt I: Auftraggeber
   I.1)Name und Adressen
   Offizielle Bezeichnung: Uniper SE
   Postanschrift: Holzstraße 6
   Ort: Düsseldorf
   NUTS-Code: DEA11 Düsseldorf, Kreisfreie Stadt
   Postleitzahl: 40221
   Land: Deutschland
   E-Mail: [6]juliana.moritzen@uniper.energy
   Telefon: +49 15116888224
   Internet-Adresse(n):
   Hauptadresse: [7]https://www.deutsche-evergabe.de
   I.3)Kommunikation
   Die Auftragsunterlagen stehen für einen uneingeschränkten und
   vollständigen direkten Zugang gebührenfrei zur Verfügung unter:
   [8]https://www.deutsche-evergabe.de/dashboards/dashboard_off/3537B3D8-1
   1E5-4A27-BE35-B5D7D85DB86A
   Weitere Auskünfte erteilen/erteilt die oben genannten Kontaktstellen
   Angebote oder Teilnahmeanträge sind einzureichen elektronisch via:
   [9]https://www.deutsche-evergabe.de/dashboards/dashboard_off/3537B3D8-1
   1E5-4A27-BE35-B5D7D85DB86A
   Im Rahmen der elektronischen Kommunikation ist die Verwendung von
   Instrumenten und Vorrichtungen erforderlich, die nicht allgemein
   verfügbar sind. Ein uneingeschränkter und vollständiger direkter Zugang
   zu diesen Instrumenten und Vorrichtungen ist gebührenfrei möglich
   unter: [10]https://www.deutsche-evergabe.de
   I.6)Haupttätigkeit(en)
   Strom
   Abschnitt II: Gegenstand
   II.1)Umfang der Beschaffung
   II.1.1)Bezeichnung des Auftrags:
   Framework Agreement for Supply of Photovoltaic Modules
   Referenznummer der Bekanntmachung: WS1187077770
   II.1.2)CPV-Code Hauptteil
   09331200 Photovoltaische Solarmodule/Solarzellen
   II.1.3)Art des Auftrags
   Lieferauftrag
   II.1.4)Kurze Beschreibung:
   Framework Agreement for Supply of Photovoltaic Modules
   II.1.5)Geschätzter Gesamtwert
   Wert ohne MwSt.: 295 000 000.00 EUR
   II.1.6)Angaben zu den Losen
   Aufteilung des Auftrags in Lose: nein
   II.2)Beschreibung
   II.2.2)Weitere(r) CPV-Code(s)
   09331200 Photovoltaische Solarmodule/Solarzellen
   II.2.3)Erfüllungsort
   NUTS-Code: DEA11 Düsseldorf, Kreisfreie Stadt
   Hauptort der Ausführung:
   in den Vergabeunterlagen aufgeführt
   II.2.4)Beschreibung der Beschaffung:
   Uniper is tendering a Framework Agreement for the supply of PV modules
   for utility-scale PV projects.
   The ambition is to create a portfolio of Framework Agreements to cover
   Purchasers needs for the PV projects of the RES business unit whenever
   public procurement law is applicable to a project under the DIRECTIVE
   2014/25/EU as well as under the relevant national rules of the Member
   States implementing the Directive.
   II.2.5)Zuschlagskriterien
   Die nachstehenden Kriterien
   Qualitätskriterium - Name: Flexibility and Diversification of the
   supplier chain For security of supply reasons and flexibility in
   manufacturing timeline and location it is considered beneficial to have
   a larger PV module manufacturing capacity as well as PV module
   manufacturing capacity in several locations. Suppliers are asked to
   list their existing and announced PV Module manufacturing locations and
   capacity (GW/yr) as well as their supplier structure. Scoring will be
   based on the total capacity (GW/yr), the number of separate PV module
   factories and the geographical distribution of the factories in
   different countries. (further details concerning the evaluation scheme
   are explained in the RFP document) / Gewichtung: 40
   Qualitätskriterium - Name: Vertical integration of the Suppliers
   supply chain: a. The key component within crystalline silicon modules
   is the solar cell. A PV module Supplier that also manufactures solar
   cells and its subcomponents has a higher transparency of its supply
   chain and secondly also better security of supply. For this reason,
   more vertical integration has a benefit over Suppliers that need to
   source the solar cells from other companies. Scoring will be based on
   the manufacturing capacity of the following steps in the value chain:
   i. Quartz (kT/yr) ii. silicon metal (kT/yr) iii. polysilicon (kT/yr)
   iv. ingots (GW/yr) v. wafers (GW/yr) vi. cells (GW/yr) (further details
   concerning the evaluation scheme are explained in the RFP document) /
   Gewichtung: 30
   Qualitätskriterium - Name: European representation of the Supplier
   (sales, aftersales, technical support) European representation of the
   Supplier is beneficial for the ease of communication, potential
   face-to-face meetings, site visits, etc. for example, upon delivery.
   Suppliers will be awarded if following positions are based within
   Europe: vii. Key account manager (KAM) / sales manager, or similar
   viii. Head of European business, or similar ix. Pre-sales technical
   support, or similar (for technical support in mini-competition phase)
   x. After-sales technical support, or similar (for technical support in
   construction and operation phase, potential warranty claims) (further
   details concerning the evaluation scheme are explained in the RFP
   document) / Gewichtung: 20
   Qualitätskriterium - Name: Storage capacities and inventory management
   A high total storage capacity as well as the geographic diversification
   of the storage facilities in different countries increases the delivery
   flexibility and serves the security of the supply chain. Inventory
   management that ensures a high ratio of available stock to several PV
   module types and dimensions also increases supply chain security. In
   their concept, the bidders must provide information on the storage
   locations and the respective maximum storage capacities and explain the
   storage management concept (further details concerning the evaluation
   scheme are explained in the RFP document) / Gewichtung: 10
   Kostenkriterium - Name: There is no cost criteria at this stage, it
   will be part of the mini-competition / Gewichtung: 1
   II.2.6)Geschätzter Wert
   Wert ohne MwSt.: 295 000 000.00 EUR
   II.2.7)Laufzeit des Vertrags, der Rahmenvereinbarung oder des
   dynamischen Beschaffungssystems
   Laufzeit in Monaten: 36
   Dieser Auftrag kann verlängert werden: ja
   Beschreibung der Verlängerungen:
   The Framework Agreement will be in force for a fixed term of three (3)
   years, and the procurement includes an option to extend the contract
   duration annually for a maximum of two (2) additional years.
   II.2.10)Angaben über Varianten/Alternativangebote
   Varianten/Alternativangebote sind zulässig: nein
   II.2.11)Angaben zu Optionen
   Optionen: nein
   II.2.13)Angaben zu Mitteln der Europäischen Union
   Der Auftrag steht in Verbindung mit einem Vorhaben und/oder Programm,
   das aus Mitteln der EU finanziert wird: nein
   II.2.14)Zusätzliche Angaben
   Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische
   Angaben
   III.1)Teilnahmebedingungen
   III.1.1)Befähigung zur Berufsausübung einschließlich Auflagen
   hinsichtlich der Eintragung in einem Berufs- oder Handelsregister
   Auflistung und kurze Beschreibung der Bedingungen:
   Bidders have to provide information on the exclusion criteria pursuant
   to item 2 of form II (see list of Article 57 of Directive 2014/24).
   Additionally they have to give information on legally binding decisions
   imposing fines for an administrative offence under Section 21 (1) of
   (2) MiLoG by using form III. Bidders have to hand in a current excerpt
   from the commercial register.
   Supplier accepts the Uniper Supplier Code of Conduct (Appendix 2) and
   commits to act accordingly.
   III.1.2)Wirtschaftliche und finanzielle Leistungsfähigkeit
   Auflistung und kurze Beschreibung der Eignungskriterien:
   1. A minimum total turnover of 30 M/year Euro (net) must have been
   reached or exceeded in each of the last 3 completed financial years
   (2020-2022).
   2. The candidate shall provide in Form IV the required information on a
   Public, Product and Pollution Liability Insurance with the minimum sum
   insured therein in the amount of EUR 10 Mio. per occurrence and in the
   annual aggregate.
   Möglicherweise geforderte Mindeststandards:
   III.1.3)Technische und berufliche Leistungsfähigkeit
   Auflistung und kurze Beschreibung der Eignungskriterien:
   1. Supplier has supplied to date cumulatively at least 200MWp of PV
   modules to utility-scale PV projects in Europe during the past three
   (3) years prior to the deadline of the requests to participate.
    Required documentation: a reference-list and short description of the
   completed supplies delivered over the preceding three years, and
   details of their value, time and public or private recipient, to be
   given in form VII
   2. In order to show that Supplier has a sufficient level of
   manufacturing maturity and capacity, Supplier needs to have at least 5
   years of module manufacturing experience by 31 Dec 2022 and the annual
   production capacity as of 01 Jan 2023 shall be at least 1 GWp.
    Required documentation: Brief description of the nature and duration
   of the Suppliers module manufacturing experience and confirmation of
   the annual production capacity by each manufacturing site, to be given
   in on form XV.
   3. Supplier has valid quality management system according to ISO 9001
   or corresponding certified operating procedures, for all his
   manufacturing sites, issued by an accredited body
    Confirmation on the form VI. In addition required documentation: copy
   of the relevant certificate from accredited bodies to be provided with
   the submission of the request to participate.
   4. Supplier has valid environmental management measures system applied
   by the company during the execution of the contract according to ISO
   14001 or corresponding certified operating procedures, for all his
   manufacturing sites, issued by an accredited body.
    Confirmation on the form VI. In addition required documentation: copy
   of the relevant certificate from accredited bodies to be provided with
   the submission of the request to participate.
   5. Supplier has valid occupational health and safety (OH&S) management
   system applied by the company during the execution of the contract
   according to ISO 45001 or corresponding certified operating procedures,
   for all his manufacturing sites, issued by an accredited body.
    Confirmation on the form VI. In addition required documentation: copy
   of the relevant certificate from accredited bodies to be provided with
   the submission of the request to participate.
   6. Supplier complies with all requirements in our Quality Assurance
   Document
    Confirmation on the form VI.
   7. Supplier has an established Product Qualification Program (PQP)
   based on Highly Accelerated Life Tests as per IEC TS 63209-1 or similar
   to ensure product reliability during product design and qualification
   phase before going to the market.
    Required documentation on form VI: a short description of the test
   sequences and pass/fail criteria adopted. Confirm if the PQP is being
   carried out by a third party or in-house.
   8. Supplier has the following IEC Certifications for their PV modules
    IEC 61215 (all applicable parts): Terrestrial photovoltaic (PV)
   modules  Design qualification and type approval;
    IEC 61730-1, -2: Photovoltaic (PV) module safety qualification, Part
   1: Requirements for construction, Part 2: Requirements for testing;
    CE Mark
   Suppliers will have to provide further IEC certificates during the
   mini-competition phase, according to the conditions of the specific
   project.
    Confirmation on the form VI. In addition required documentation: copy
   of the relevant certificate from accredited bodies to be provided with
   the submission of the request to participate.
   9. Supplier is able and also organizationally set up to deliver the PV
   modules to Europe DDP Installation Site, Incoterms 2020.
    Confirmation on the form VI.
   Möglicherweise geforderte Mindeststandards:
   III.1.4)Objektive Teilnahmeregeln und -kriterien
   Auflistung und kurze Beschreibung der Regeln und Kriterien:
   III.1.6)Geforderte Kautionen oder Sicherheiten:
   III.1.7)Wesentliche Finanzierungs- und Zahlungsbedingungen und/oder
   Hinweise auf Vorschriften, in denen sie enthalten sind:
   DDP Incoterms 2020
   III.1.8)Rechtsform, die die Unternehmensgruppe, der der Auftrag erteilt
   wird, haben muss:
   III.2)Bedingungen für den Auftrag
   III.2.2)Bedingungen für die Ausführung des Auftrags:
   Compliance with the Uniper Supplier Code of conduct, compliance with
   the Quality Assurance Requirements (according to Annex 1.3 of the RFP);
   provision of required insurances protection (according to draft
   contract)
   Abschnitt IV: Verfahren
   IV.1)Beschreibung
   IV.1.1)Verfahrensart
   Verhandlungsverfahren mit vorherigem Aufruf zum Wettbewerb
   IV.1.3)Angaben zur Rahmenvereinbarung oder zum dynamischen
   Beschaffungssystem
   Die Bekanntmachung betrifft den Abschluss einer Rahmenvereinbarung
   Rahmenvereinbarung mit mehreren Wirtschaftsteilnehmern
   Geplante Höchstanzahl an Beteiligten an der Rahmenvereinbarung: 6
   IV.1.8)Angaben zum Beschaffungsübereinkommen (GPA)
   Der Auftrag fällt unter das Beschaffungsübereinkommen: nein
   IV.2)Verwaltungsangaben
   IV.2.2)Schlusstermin für den Eingang der Angebote oder Teilnahmeanträge
   Tag: 20/10/2023
   Ortszeit: 12:00
   IV.2.3)Voraussichtlicher Tag der Absendung der Aufforderungen zur
   Angebotsabgabe bzw. zur Teilnahme an ausgewählte Bewerber
   Tag: 02/11/2023
   IV.2.4)Sprache(n), in der (denen) Angebote oder Teilnahmeanträge
   eingereicht werden können:
   Englisch
   IV.2.6)Bindefrist des Angebots
   Das Angebot muss gültig bleiben bis: 30/03/2024
   Abschnitt VI: Weitere Angaben
   VI.1)Angaben zur Wiederkehr des Auftrags
   Dies ist ein wiederkehrender Auftrag: nein
   VI.3)Zusätzliche Angaben:
   The procedure conducted by the contracting authority is a negotiated
   procedure with a preceding call for tenders in accordance with the
   SektVO. The principles of transparency of the procedure and equal
   treatment of all applicants under public procurement law are strictly
   observed throughout the entire procedure. The announcement initiates
   the preliminary competition. If interested in participating, a request
   to participate must be submitted by the deadline specified in Section
   IV.2.2. It is not yet necessary to submit a bid at this stage of the
   procedure. Please be sure to read the further information on the award
   procedure, which you can access in the following link:
   [11]http://www.deutscheevergabe.de/dashboards/dashboard_off/3537b3d811e
   54a27be35b5d7d85db86a .
   The personal data requested from applicants will be processed and
   stored as part of the award procedure (data protection clause). The
   information is a prerequisite for consideration of a participation
   application / bid. A corresponding information sheet "Information on
   the processing of personal data" is attached to the award document.
   VI.4)Rechtsbehelfsverfahren/Nachprüfungsverfahren
   VI.4.1)Zuständige Stelle für Rechtsbehelfs-/Nachprüfungsverfahren
   Offizielle Bezeichnung: Die Vergabekammern des Bundes
   Postanschrift: Villemombler Straße 76
   Ort: Bonn
   Postleitzahl: 53123
   Land: Deutschland
   E-Mail: [12]vk@bundeskartellamt.bund.de
   Telefon: +49 22894990
   Fax: +49 2289499163
   VI.4.3)Einlegung von Rechtsbehelfen
   Genaue Angaben zu den Fristen für die Einlegung von Rechtsbehelfen:
   (1) Pursuant to Section 160 (3) No. 1 GWB (Gesetz gegen
   Wettbewerbsbeschränkungen), the candidate/bidder must report any
   infringements of award regulations within 10 days of becoming aware of
   them.
   (2) Pursuant to Section 160 (3) No. 2 GWB (Gesetz gegen
   Wettbewerbsbeschränkungen), any infringements of procurement rules
   which are apparent from the notice shall be notified to the contracting
   entity no later than the expiry of the period for submission of
   applications or tenders specified in the notice.
   (3) Pursuant to Section 160 (3) No. 3 GWB (Gesetz gegen
   Wettbewerbsbeschränkungen), violations of procurement rules which are
   only apparent in the award documents shall be notified to the
   contracting authority no later than the expiry of the period for
   submission of applications or bids.
   (4) Pursuant to Section 160 (3) No. 4 GWB (Gesetz gegen
   Wettbewerbsbeschränkungen), an application for review of award
   procedures shall be filed with the Procurement Chamber within 15
   calendar days after the contracting entity has notified the contracting
   entity that it does not intend to remedy a complaint.
   VI.5)Tag der Absendung dieser Bekanntmachung:
   11/09/2023
References
   6. mailto:juliana.moritzen@uniper.energy?subject=TED
   7. https://www.deutsche-evergabe.de/
   8. https://www.deutsche-evergabe.de/dashboards/dashboard_off/3537B3D8-11E5-4A27-BE35-B5D7D85DB86A
   9. https://www.deutsche-evergabe.de/dashboards/dashboard_off/3537B3D8-11E5-4A27-BE35-B5D7D85DB86A
  10. https://www.deutsche-evergabe.de/
  11. http://www.deutscheevergabe.de/dashboards/dashboard_off/3537b3d811e54a27be35b5d7d85db86a
  12. mailto:vk@bundeskartellamt.bund.de?subject=TED
--------------------------------------------------------------------------------
             Database Operation & Alert Service (icc-hofmann) for:
       The Office for Official Publications of the European Communities
                The Federal Office of Foreign Trade Information
 Phone: +49 6082-910101, Fax: +49 6082-910200, URL: http://www.icc-hofmann.de
Ausschreibung ausschreibung Ausschreibungen Ingenieure Öffentliche Ausschreibungen Datenbank Öffentliche Ausschreibungen Architekten Öffentliche Ausschreibungen Bau